Inventory Model of Nuclear Power Plant Decommissioning Waste and Dismantling Engineering Plan
In order to systematically perform the decommissioning for nuclear power plant, it is several necessary to establish an inventory of relevant waste based on aspects such as classification, transportation, disposal, and cost estimation. This inventory can be developed by referencing various internal data regarding mechanical, instrumentation and electrical, and civil structures of the nuclear power plant, coupled with on-site inspections and interviews with plant personnel. Through this process, an inventory of decommissioning waste including weight, dimensions, and radiation levels can be complied. Subsequently, based on the inventory findings, dismantling plans for various areas of the nuclear power plant can be formulated, facilitating the smooth progress of decommissioning-related operations.
核能安全、輻射防護、緊急應變、以及核後端相關技術研發
Name:
Phone: 034711400#3359
Address:No. 1000, Wenhua Rd., Longtan Dist., Taoyuan City 325, Taiwan (R.O.C.)
The Intelligent Cloud Platform for the Machinery Industry and on-premise Taiwan Machinery Standard Runtime networking technologies.
Micro inductive tactile/force sensing chip for the applications of force detection and human-machine interface
Data determination method for supplying-end module of induction type power supply system and related supplying-end module
Supplying-end module of induction type power supply system and voltage measurement method thereof
Technology maturity:Mass production
Exhibiting purpose:Technology transactions、Product promotion、Display of scientific results
Trading preferences:Technical license/cooperation、Negotiate by self
Coming soon!